Current Status:

 
Having completed my role
in Surgut, Russia... I'm
now working in Kuwait

Mob-Date: April 2011

PROJECT:
Sabiya CCGT Power Station; 
Major Equip.
(6) GE-9FA 50Hz Gas Turbines
(3) GE-D11 Steam Turbines and
Support Equipment

CURRENT POSITION:
GE-TransGlobal (Start-Up
Commissioning) Systems
Turnover Coordinator -TOP

My Social Network:


My Professional Network:

 


My Worldwide International
Phone/Video Network


My Skype Name: al.carpenter


Al - Cell# (817) 705-6569
Contact / Email

Julia - Cell# (770) 375-5518
(my wife)

fp-nuclear

Hands on Experience

Print PDF
 
AlCarpenter.com_007Power Plant Major Equipment: Turbines / Generators / ID-Fans

(2)- Outages / GE Frame 7FA Gas Turbines

(2)- Outages / GE D11 Steam Turbines

(12)-Outages / ABB GT24 Gas Turbines

(2)- Inspections / Siemens 35MW Steam Turbines

(4)- Inspections / Siemens Vax Units 64.3A Steam Turbines               

(8)- New Installations / Commission Howden Buffalo L3N Size 3786 DWDI – ID-Fans

(2)- New Installations / Commission Flaktwood AF-6310A – ID-Fans 1,111,000 ACFM

(4)- New Installations / Commission Flaktwood 2490 DYW Booster Fans 621,000 ACFM

(1)- New Installations / Caterpillar - Solar Mars 100 Gas Turbine Generator Set kWe 10,695

(16)- New Installations / Commission / GE Frame 7FA Gas Turbines

(9)- New Installations / GE D11 Steam Turbines

(2)- New Installations / Westinghouse W501G Gas Turbines

(4)- New Installations / Mitsubishi 501F Dual Fuel Turbines

(1)- New Installation / Toshiba 190MW Steam Turbines

(8)- New Installations / ABB GT24 Gas Turbines

(2)- New Installations / Startup / GE LM6000 (Aero-Derivative)

(3)- New Installations / Startup / Pratt & Whitney FT8 Swift Twin Pac (Aero-Derivative)

(8)- New Installations / Startup / Commission / GE Frame 9FA Gas Turbines (50HZ) 


Misc. Reciprocating Equipment: Compressors / Pumps

(2) - Re-machine / Overhaul Dresser-Rand DR63G-60 Gas Turbines

(8) - Re-machine / Overhaul Dresser-Rand DR62G Gas Turbines

(4) - Refurbish / Ingersoll-Rand Nitrogen Compressors (450Hp)

(-) - Overhaul (various types) Ingersoll-Rand Multistage Centrifugal Pumps

(1) - Overhaul 700,000 GPM Vertical Pump - Ingersoll-Rand (IR)

(2) - Major Inspection on I-R CDP-224 Compressors

(30+)-Major overhaul I-R 6,000psi H-P Compressors

(4) - Inspection of I-R High Pressure Cap Units

(12)- Inspection - Rebuild I-R Axi-vac Screw Compressors 


Heavy Industrial Conveyors / Crane Systems

Material (Gypsum) Processing, Hoppers, Monorails, Jib, Cable, Radial Stackers, Galleries, Trusses (cable suspension conveyors)


Material Handling and Storage Equipment

Material Handling Conveyors; Gravity Roller, Powered Belt, Skate-wheel, Powered Roller, Extendable, Special Purpose, Overhead, Pallet, Door Openers (hyd), Elevated Lay-downs,  


Monorails / Tube Systems / Dock Lifts

Loading and unloading of materials from sea/shipping containers to buildings; Electrified / Mechanical Monorail Systems, Vacuum Systems, Blow Tube Systems,


Design / Assemble Robotic Equipment

Assembly of electrical components on Automated Guided Vehicles; Fork lift devices, Automatic stacker cranes, Racking systems. New construction power supply panels, Surface mount and thru-hole PCB assembly, Control panels, soldering multi-panels,


Design / Repair / Assemble Electronic Equipment

PC-boards, radios, clocks, TV's, Home/business alarm systems, Digital video stabilizers, audio video/VHS switches, Sound-Mixers, amplified antennas, Designed / Install - Surveillance cameras, intercom systems, Security lock systems, automatic gate locks and custom, Stereos, TV monitors, crossovers, graphic equalizers